Waste products
Green waste and building waste that have been present in the QLD or NSW fire ant infested area or the Murwillumbah or Wardell movement control areas, must not be moved into NSW unless the following requirements have been met under the Biosecurity Emergency Order and the Group Biosecurity Permit.
Quick guide
Read the sections below for specific carrier requirements.
Carrier | Premises Check | Premises Treat | Carrier Treat | Preventative Conditions | PHC* | PHAC* | BioSecure HACCP* | RoM |
---|---|---|---|---|---|---|---|---|
Green waste & building waste from FAIA | ||||||||
Green waste & building waste from MCA |
FAIA - Fire ant infested areas | MCA - Movement control areas | * Only ONE biosecurity certificate is required.
Carrier requirements:
Green waste and building waste
New definition
Waste including bricks, concrete, paper, plastics, glass, metal, plaster and fibre cement board, timber waste, grass, vegetation and clippings (but doesn’t include mulch).
To move green waste and building waste into NSW from the QLD or NSW fire ant infested area or the Murwillumbah or Wardell movement control areas, you must consider the following:
To move green waste and building waste from the QLD or NSW fire ant infested areas you must: | To move green waste and building waste from the Murwillumbah or Wardell movement control areas you must: |
---|---|
|
|
See the Order (Clause 20) | See the Order (Clause 20) |